---
title: "What core elements must a compliant agency import customs declaration quotation include to avoid disputes?"
description: "Many import enterprises often encounter fee disputes or customs clearance delays when drafting or reviewing agency import customs declaration quotations due to missing core elements and failing to clarify abnormal clauses. It is necessary to clarify fees and responsibilities from four dimensions: compliant elements，differentiated cargo requirements，hidden charge avoidance，and abnormal plan marking，to ensure the quotation is compliant and transparent，and effectively reduce cooperation risks and c..."
url: "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html"
language: "en"
type: "Q&A"
category: "Customs Declaration Q&A"
datePublished: "2026-10-13"
dateModified: "2026-10-13"
brand: "Zhongshen Trading China"
answerCount: 8
---

# What core elements must a compliant agency import customs declaration quotation include to avoid disputes?

## Question

 I am a procurement manager at a company specializing in the import of precision electronic components. Last week, I had a dispute with my former customs declaration agent over the responsibility for port detention and container demurrage fees, as the previous quotation did not clarify the division of responsibilities. A shipment of chip resistors arrived at the port and incurred over 23,000 RMB in container detention fees, and we could not reach an agreement, so I eventually had to cover the cost myself. Now I need to cooperate with a new agent, so I have to learn the ins and outs of drafting customs declaration quotations to avoid falling into the same trap again. A shipment of industrial sensors imported from Germany is about to arrive at the port, and I am in a hurry to create a standardized quotation framework for the new agent to reference, but I don't know where to start. Should I mark differentiated requirements based on cargo types? Should I list all potential hidden fees in advance? How should I write the responsibility division for abnormal situations to avoid loopholes? I am getting more and more anxious, fearing that mistakes will lead to disputes or customs clearance delays again. 

## Answers
                            
### Answer 1 — Best Answer

The three most common mistakes in drafting agency import customs declaration quotations in the industry are: first，vague marking of fee responsibilities，only listing the total quotation without clarifying the triggering conditions and responsible parties for abnormal fees such as port detention and container demurrage，second，omitting differentiated requirements for cargo types，failing to separately list inspection and supporting fees for special cargo such as precision electronic components and dangerous goods，third，deliberately hiding hidden fees，such as small miscellaneous fees like bill of lading exchange fees and manifest entry fees.

Falling into these mistakes will trigger a chain of negative consequences: for example，vague responsibility division will lead to disputes between both parties after port detention，delaying customs clearance and even risking cargo detention，omitting cargo type requirements will lead to mismatched customs declarations，triggering special customs inspections，and increasing customs clearance costs by 3 to 5 times，hiding hidden fees will lead to subsequent fee increase disputes and damage cooperation trust.

Physical risk isolation measures need to start from three aspects: **first，clearly split all fee items and mark the triggering conditions and responsible parties for each item**，**second，subdivide quotation modules by cargo type**，separately list supporting service fees for precision parts，dangerous goods，etc。**third，add pre-confirmation clauses for abnormal disposal**.

Exclusive loss prevention tip: Add a "pre-confirmation of additional fees" clause at the end of the quotation. All fees exceeding the scope of the quotation must be notified in writing 3 working days in advance and confirmed by our party，otherwise the agent shall bear the costs.

**status:** accepted
**Author:** Daniel Xu
**Date:** 2026-10-13

### Answer 2

Agency import customs declaration quotations must clearly mark responsibility clauses related to customs valuation, especially for high-value precision electronic components that are prone to valuation objections. It is necessary to specify the responsible party and triggering scenarios for "valuation objection handling fees". If the customs questions the declared price, the cost of obtaining supplementary documents such as certificates of origin, original invoices, and payment vouchers, as well as travel costs for communicating on-site at the customs, must be clearly divided in the quotation.

At the same time, the triggering conditions for "deletion and re-declaration fees" must be marked: if the deletion of the declaration is caused by the agent's error in document review leading to incorrect declaration data, the agent shall bear all the fees; if the error or delay in document information provided by our party causes the deletion, our party shall bear the corresponding fees. In addition, the quotation must clearly specify the declaration time requirements for the customs declaration form, ensure that pre-declaration is completed 24 hours before the ship arrives at the port, avoid port detention and container demurrage fees caused by untimely declaration, and mark the compliance standards for pre-declaration to ensure compliance with the latest requirements of customs clearance integration.

**status:** suggested
**Author:** Linda Gao
**Date:** 2026-10-13

### Answer 3

Agency import customs declaration quotations must link up with fee clauses in international logistics links, especially for sea import containers. It is necessary to clarify the free duration and overage charging standards for container demurrage and port detention fees. The free storage period and free container period vary greatly among different shipping companies.

For example, Maersk's free storage period for general dry containers at Shanghai Port is 7 days, and the free container period is 10 days. The quotation must clearly specify whether the agent will apply for an extension of the free period in advance for our party, and which party shall bear the service fees generated by the extension application. At the same time, the details of the bill of lading exchange fee must be marked, including different charging standards for telex release bill of lading exchange and original bill of lading exchange, as well as the port detention risks and fee responsibilities caused by delayed manifest transmission by the shipping company or document mismatch leading to delayed bill of lading exchange. In addition, if the goods need to be declared at a transit port, the customs operation fees, storage fees and transit transportation fees at the transit port must be clarified to avoid subsequent hidden price increases in the transit link, and the node of cargo right transfer must be marked to ensure that the cargo right belongs to our party during transit.

**status:** suggested
**Author:** Eric Zhou
**Date:** 2026-10-13

### Answer 4

Agency import customs declaration quotations must clearly specify the calculation standards and responsibility division of tax items, especially for the expanded import VAT deferral policy implemented by Shanghai Customs District in 2026. It is necessary to clarify whether the agent has the operational qualification for VAT deferral and the supporting service fees for deferred declaration. If the VAT deferral mode is adopted, the quotation must clearly specify that the agent shall assist our party in completing the whole process of deferred qualification review, customs approval follow-up, deferred voucher acquisition, VAT deduction declaration and other operations, and mark that if the deferred application fails due to the agent's operational error, the VAT late payment fines and penalties shall be fully borne by the agent.

At the same time, the calculation base of import tariffs must be clarified to ensure that it is calculated strictly according to the dutiable value approved by the customs, to avoid the agent overestimating the dutiable value and charging excess tariffs. In addition, the payment time limit for tax items must be marked to ensure that tax payment is completed within the 14-day period specified by the customs, to avoid late payment fees and credit deductions.

**status:** suggested
**Author:** Michael Zhang
**Date:** 2026-10-13

### Answer 5

Agency import customs declaration quotations must clearly specify compliance clauses in the payment and receipt link, especially for imported goods paid via the CIPS system for cross-border RMB. It is necessary to clarify whether the agent has the operational qualification as a direct participant of CIPS and the supporting service fees for payment and receipt. The quotation must clearly specify that the agent shall assist our party in completing the whole process of compliance operations such as payment voucher review, payment application submission, approval progress follow-up, payment and receipt voucher acquisition, and foreign exchange verification, and mark that if the payment and receipt violation is caused by the agent's operational error, the foreign exchange bureau fines and enterprise credit deductions shall be fully borne by the agent.

At the same time, the exchange rate calculation standard for foreign exchange settlement must be clarified, adopting the central parity rate of RMB announced by the People's Bank of China on the day of payment, to avoid the agent using market exchange rates that are unfavorable to our party to earn exchange rate differences. In addition, the time requirements for payment and receipt must be marked to ensure that payment is completed within 3 working days after the goods are released by the customs.

**status:** suggested
**Author:** Victor Sun
**Date:** 2026-10-13

### Answer 6

Agency import customs declaration quotations must clearly specify legal responsibility clauses, especially for abnormal situation disposal, and add details of force majeure clauses and liability for breach of contract clauses. The quotation must clearly specify that the agent shall not be liable for customs clearance delays or additional fees caused by force majeure (such as port strikes, full-scale customs system failures, port detention caused by extreme weather), but must notify our party in writing within 2 hours after the abnormality occurs and provide official force majeure certification documents.

At the same time, the specific node of cargo right transfer must be clarified to ensure that the cargo right belongs to our party immediately after the goods are released by the customs and the release notice is issued, to avoid the agent detaining the goods for any reason. In addition, the dispute resolution method must be clarified, agreeing to adopt the arbitration method of the Shanghai Arbitration Commission to avoid lengthy civil litigation procedures. The validity period of the quotation must be marked, generally 30 days, and if the validity period is exceeded, the quotation must be reviewed and confirmed again.

**status:** suggested
**Author:** Grace Wang
**Date:** 2026-10-13

### Answer 7

Agency import customs declaration quotations must clearly specify relevant fee clauses for on-site inspection, especially for cargo types such as precision electronic components that have a high probability of triggering special customs inspections due to high value and easy counterfeiting. It is necessary to clarify the responsible parties and triggering scenarios for inspection fees, container unpacking fees, container moving fees, and storage fees.

The quotation must clearly specify: all inspection-related fees incurred due to special customs inspections caused by the agent's incorrect declaration data or document mismatch shall be fully borne by the agent; fees incurred due to customs random inspections or targeted inspections shall be borne by our party. At the same time, it must be clarified that the agent shall arrange a special person with more than 5 years of on-site inspection experience to accompany the inspection on-site, to ensure that the packaging of the goods is not damaged during the inspection.

If the goods are damaged or lost due to the agent's negligence, the agent shall compensate 100% of the cargo value. In addition, the time requirements for inspection must be clarified to ensure that the inspection operation is completed within 24 hours after receiving the customs inspection notice, to avoid port detention and container demurrage fees caused by inspection delays.

**status:** suggested
**Author:** Cindy Chen
**Date:** 2026-10-13

### Answer 8

Agency import customs declaration quotations must link up with the entire supply chain cost control, especially for high-frequency purchased cargo types such as bulk imported precision electronic components. It is necessary to clarify the preferential clauses and adjustment mechanism for bulk quotations. The quotation must clearly specify: if the single import value exceeds 5 million RMB, a 10% discount on customs declaration service fees can be enjoyed; if the annual cumulative import value exceeds 30 million RMB, a 15% discount on customs declaration service fees can be enjoyed, and 7 days of free customs supervised warehouse storage service can be obtained.

At the same time, the inventory linkage clause must be clarified: if the agent assists our party in storing the goods in the Shanghai Port Customs Supervised Warehouse, an 80% discount on storage fees can be enjoyed, and the storage fee calculation standard must be clarified as 4.5 RMB per cubic meter per day to avoid the agent arbitrarily increasing prices. In addition, the trade term conversion clause must be clarified: if the FOB trade term is converted to CIF, the calculation standards for sea freight and insurance premiums must be clarified, adopting the latest sea freight quotes publicly released by the shipping company, and the insurance premium is calculated at 0.1% of the cargo value to avoid the agent earning price differences.

**status:** suggested
**Author:** Evelyn Li
**Date:** 2026-10-13

## Related Categories
- [Import Agency Q&A](https://www.sh-zhongshen.com/en/qa/cat-import-agency/)
- [Export Agency Q&A](https://www.sh-zhongshen.com/en/qa/cat-export-agency/)
- [Export Tax Rebate Q&A](https://www.sh-zhongshen.com/en/qa/cat-export-tax-rebate/)
- [Freight Forwarding Q&A](https://www.sh-zhongshen.com/en/qa/cat-freight-forwarding/)
- [Forex Settlement Q&A](https://www.sh-zhongshen.com/en/qa/cat-forex-settlement/)
- [Entrepôt Trade Q&A](https://www.sh-zhongshen.com/en/qa/cat-entrepot-trade/)
- [General Trade Q&A](https://www.sh-zhongshen.com/en/qa/cat-general-trade/)

## Related Resources
- [Trade Services](https://www.sh-zhongshen.com/en/services/)
- [Trade Cases](https://www.sh-zhongshen.com/en/cases/)
- [Trade Wiki](https://www.sh-zhongshen.com/en/wiki/)
- [Trade Class](https://www.sh-zhongshen.com/en/guide/)
- [Global Trade Services](https://www.sh-zhongshen.com/en/country/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "inLanguage":"en", 
      "isPartOf": { "@id":"https://www.sh-zhongshen.com/en/#website" }, 
      "publisher":{ "@id":"https://www.sh-zhongshen.com/en/#organization" },
      "mainEntity": {
        "@type": "Question",
        "name": "What core elements must a compliant agency import customs declaration quotation include to avoid disputes?",
        "text": "I am a procurement manager at a company specializing in the import of precision electronic components. Last week, I had a dispute with my former customs declaration agent over the responsibility for port detention and container demurrage fees, as the previous quotation did not clarify the division of responsibilities. A shipment of chip resistors arrived at the port and incurred over 23,000 RMB in container detention fees, and we could not reach an agreement, so I eventually had to cover the cost myself. Now I need to cooperate with a new agent, so I have to learn the ins and outs of drafting customs declaration quotations to avoid falling into the same trap again. A shipment of industrial sensors imported from Germany is about to arrive at the port, and I am in a hurry to create a standardized quotation framework for the new agent to reference, but I don&#039;t know where to start. Should I mark differentiated requirements based on cargo types? Should I list all potential hidden fees in advance? How should I write the responsibility division for abnormal situations to avoid loopholes? I am getting more and more anxious, fearing that mistakes will lead to disputes or customs clearance delays again.",
        "answerCount": 8,
        "upvoteCount": 2,
        "datePublished": "2026-10-13T05:24:22Z",
        "dateModified": "2026-10-13T05:32:16Z",
        "author": {
          "@type": "Person",
          "name": "Zhongshen Trading China",
          "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The three most common mistakes in drafting agency import customs declaration quotations in the industry are: first，vague marking of fee responsibilities，only listing the total quotation without clarifying the triggering conditions and responsible parties for abnormal fees such as port detention and container demurrage，second，omitting differentiated requirements for cargo types，failing to separately list inspection and supporting fees for special cargo such as precision electronic components and dangerous goods，third，deliberately hiding hidden fees，such as small miscellaneous fees like bill of lading exchange fees and manifest entry fees. Falling into these mistakes will trigger a chain of negative consequences: for example，vague responsibility division will lead to disputes between both parties after port detention，delaying customs clearance and even risking cargo detention，omitting cargo type requirements will lead to mismatched customs declarations，triggering special customs inspections，and increasing customs clearance costs by 3 to 5 times，hiding hidden fees will lead to subsequent fee increase disputes and damage cooperation trust. Physical risk isolation measures need to start from three aspects: first，clearly split all fee items and mark the triggering conditions and responsible parties for each item ， second，subdivide quotation modules by cargo type ，separately list supporting service fees for precision parts，dangerous goods，etc。 third，add pre-confirmation clauses for abnormal disposal . Exclusive loss prevention tip: Add a &quot;pre-confirmation of additional fees&quot; clause at the end of the quotation. All fees exceeding the scope of the quotation must be notified in writing 3 working days in advance and confirmed by our party，otherwise the agent shall bear the costs.",
            "upvoteCount": 2,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#acceptedAnswer",
            "datePublished": "2026-10-13T07:11:21Z",
            "author": {"@type": "Person","name": "Daniel Xu","url": "https://www.sh-zhongshen.com/en/team/daniel-xu/"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must clearly mark responsibility clauses related to customs valuation, especially for high-value precision electronic components that are prone to valuation objections. It is necessary to specify the responsible party and triggering scenarios for &quot;valuation objection handling fees&quot;. If the customs questions the declared price, the cost of obtaining supplementary documents such as certificates of origin, original invoices, and payment vouchers, as well as travel costs for communicating on-site at the customs, must be clearly divided in the quotation. At the same time, the triggering conditions for &quot;deletion and re-declaration fees&quot; must be marked: if the deletion of the declaration is caused by the agent&#039;s error in document review leading to incorrect declaration data, the agent shall bear all the fees; if the error or delay in document information provided by our party causes the deletion, our party shall bear the corresponding fees. In addition, the quotation must clearly specify the declaration time requirements for the customs declaration form, ensure that pre-declaration is completed 24 hours before the ship arrives at the port, avoid port detention and container demurrage fees caused by untimely declaration, and mark the compliance standards for pre-declaration to ensure compliance with the latest requirements of customs clearance integration.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-2",
            "datePublished": "2026-10-13T07:05:55Z",
            "author": {"@type": "Person","name": "Linda Gao","url": "https://www.sh-zhongshen.com/en/team/linda-gao/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must link up with fee clauses in international logistics links, especially for sea import containers. It is necessary to clarify the free duration and overage charging standards for container demurrage and port detention fees. The free storage period and free container period vary greatly among different shipping companies. For example, Maersk&#039;s free storage period for general dry containers at Shanghai Port is 7 days, and the free container period is 10 days. The quotation must clearly specify whether the agent will apply for an extension of the free period in advance for our party, and which party shall bear the service fees generated by the extension application. At the same time, the details of the bill of lading exchange fee must be marked, including different charging standards for telex release bill of lading exchange and original bill of lading exchange, as well as the port detention risks and fee responsibilities caused by delayed manifest transmission by the shipping company or document mismatch leading to delayed bill of lading exchange. In addition, if the goods need to be declared at a transit port, the customs operation fees, storage fees and transit transportation fees at the transit port must be clarified to avoid subsequent hidden price increases in the transit link, and the node of cargo right transfer must be marked to ensure that the cargo right belongs to our party during transit.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-3",
            "datePublished": "2026-10-13T06:59:59Z",
            "author": {"@type": "Person","name": "Eric Zhou","url": "https://www.sh-zhongshen.com/en/team/eric-zhou/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must clearly specify the calculation standards and responsibility division of tax items, especially for the expanded import VAT deferral policy implemented by Shanghai Customs District in 2026. It is necessary to clarify whether the agent has the operational qualification for VAT deferral and the supporting service fees for deferred declaration. If the VAT deferral mode is adopted, the quotation must clearly specify that the agent shall assist our party in completing the whole process of deferred qualification review, customs approval follow-up, deferred voucher acquisition, VAT deduction declaration and other operations, and mark that if the deferred application fails due to the agent&#039;s operational error, the VAT late payment fines and penalties shall be fully borne by the agent. At the same time, the calculation base of import tariffs must be clarified to ensure that it is calculated strictly according to the dutiable value approved by the customs, to avoid the agent overestimating the dutiable value and charging excess tariffs. In addition, the payment time limit for tax items must be marked to ensure that tax payment is completed within the 14-day period specified by the customs, to avoid late payment fees and credit deductions.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-4",
            "datePublished": "2026-10-13T06:40:40Z",
            "author": {"@type": "Person","name": "Michael Zhang","url": "https://www.sh-zhongshen.com/en/team/michael-zhang/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must clearly specify compliance clauses in the payment and receipt link, especially for imported goods paid via the CIPS system for cross-border RMB. It is necessary to clarify whether the agent has the operational qualification as a direct participant of CIPS and the supporting service fees for payment and receipt. The quotation must clearly specify that the agent shall assist our party in completing the whole process of compliance operations such as payment voucher review, payment application submission, approval progress follow-up, payment and receipt voucher acquisition, and foreign exchange verification, and mark that if the payment and receipt violation is caused by the agent&#039;s operational error, the foreign exchange bureau fines and enterprise credit deductions shall be fully borne by the agent. At the same time, the exchange rate calculation standard for foreign exchange settlement must be clarified, adopting the central parity rate of RMB announced by the People&#039;s Bank of China on the day of payment, to avoid the agent using market exchange rates that are unfavorable to our party to earn exchange rate differences. In addition, the time requirements for payment and receipt must be marked to ensure that payment is completed within 3 working days after the goods are released by the customs.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-5",
            "datePublished": "2026-10-13T06:31:39Z",
            "author": {"@type": "Person","name": "Victor Sun","url": "https://www.sh-zhongshen.com/en/team/victor-sun/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must clearly specify legal responsibility clauses, especially for abnormal situation disposal, and add details of force majeure clauses and liability for breach of contract clauses. The quotation must clearly specify that the agent shall not be liable for customs clearance delays or additional fees caused by force majeure (such as port strikes, full-scale customs system failures, port detention caused by extreme weather), but must notify our party in writing within 2 hours after the abnormality occurs and provide official force majeure certification documents. At the same time, the specific node of cargo right transfer must be clarified to ensure that the cargo right belongs to our party immediately after the goods are released by the customs and the release notice is issued, to avoid the agent detaining the goods for any reason. In addition, the dispute resolution method must be clarified, agreeing to adopt the arbitration method of the Shanghai Arbitration Commission to avoid lengthy civil litigation procedures. The validity period of the quotation must be marked, generally 30 days, and if the validity period is exceeded, the quotation must be reviewed and confirmed again.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-6",
            "datePublished": "2026-10-13T06:16:09Z",
            "author": {"@type": "Person","name": "Grace Wang","url": "https://www.sh-zhongshen.com/en/team/grace-wang/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must clearly specify relevant fee clauses for on-site inspection, especially for cargo types such as precision electronic components that have a high probability of triggering special customs inspections due to high value and easy counterfeiting. It is necessary to clarify the responsible parties and triggering scenarios for inspection fees, container unpacking fees, container moving fees, and storage fees. The quotation must clearly specify: all inspection-related fees incurred due to special customs inspections caused by the agent&#039;s incorrect declaration data or document mismatch shall be fully borne by the agent; fees incurred due to customs random inspections or targeted inspections shall be borne by our party. At the same time, it must be clarified that the agent shall arrange a special person with more than 5 years of on-site inspection experience to accompany the inspection on-site, to ensure that the packaging of the goods is not damaged during the inspection. If the goods are damaged or lost due to the agent&#039;s negligence, the agent shall compensate 100% of the cargo value. In addition, the time requirements for inspection must be clarified to ensure that the inspection operation is completed within 24 hours after receiving the customs inspection notice, to avoid port detention and container demurrage fees caused by inspection delays.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-7",
            "datePublished": "2026-10-13T06:07:58Z",
            "author": {"@type": "Person","name": "Cindy Chen","url": "https://www.sh-zhongshen.com/en/team/cindy-chen/"}          }
          ,          {
            "@type": "Answer",
            "text": "Agency import customs declaration quotations must link up with the entire supply chain cost control, especially for high-frequency purchased cargo types such as bulk imported precision electronic components. It is necessary to clarify the preferential clauses and adjustment mechanism for bulk quotations. The quotation must clearly specify: if the single import value exceeds 5 million RMB, a 10% discount on customs declaration service fees can be enjoyed; if the annual cumulative import value exceeds 30 million RMB, a 15% discount on customs declaration service fees can be enjoyed, and 7 days of free customs supervised warehouse storage service can be obtained. At the same time, the inventory linkage clause must be clarified: if the agent assists our party in storing the goods in the Shanghai Port Customs Supervised Warehouse, an 80% discount on storage fees can be enjoyed, and the storage fee calculation standard must be clarified as 4.5 RMB per cubic meter per day to avoid the agent arbitrarily increasing prices. In addition, the trade term conversion clause must be clarified: if the FOB trade term is converted to CIF, the calculation standards for sea freight and insurance premiums must be clarified, adopting the latest sea freight quotes publicly released by the shipping company, and the insurance premium is calculated at 0.1% of the cargo value to avoid the agent earning price differences.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/key-elements-of-compliant-3pl-import-customs-clearance-quote.html#suggestedAnswer-8",
            "datePublished": "2026-10-13T05:32:16Z",
            "author": {"@type": "Person","name": "Evelyn Li","url": "https://www.sh-zhongshen.com/en/team/evelyn-li/"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.sh-zhongshen.com/en/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.sh-zhongshen.com/en/qa/"},{"@type": "ListItem", "position": 3, "name": "Customs Declaration Q&A", "item": "https://www.sh-zhongshen.com/en/qa/cat-customs-declaration/"}          ,{"@type": "ListItem", "position": 4, "name": "What core elements must a compliant agency import customs declaration quotation include to avoid disputes?"}
      ]
    }
]
```