---
title: "How long does the normal full process of agent import customs clearance for knitting machines take? Does it include the cycle for exception handling?"
description: "A knitting factory purchasing second-hand high-end computerized knitting machines from Germany to fulfill orders from European and American clients is facing dual anxiety of demurrage charges and penalty fees due to delayed customs clearance by a small agent，and urgently needs to clarify the customs clearance duration. The normal full-link customs clearance takes 5-7 days. Pre-reviewing documents 7-10 days in advance and relying on the Shanghai Port customs integration system，if supplementary ma..."
url: "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html"
language: "en"
type: "Q&A"
category: "Customs Declaration Q&A"
datePublished: "2026-10-23"
dateModified: "2026-10-23"
brand: "Zhongshen Trading China"
answerCount: 9
---

# How long does the normal full process of agent import customs clearance for knitting machines take? Does it include the cycle for exception handling?

## Question

 I’m the person in charge of a knitting factory in Shaoxing, Zhejiang Province. Two high-end second-hand computerized knitting machines I ordered from Germany last week have arrived at Shanghai Yangshan Port. The small agent I hired previously guaranteed that customs clearance and pick-up could be completed in 7 days, but 3 days have passed and the customs declaration form hasn’t even been submitted yet—I’m so anxious I can’t sleep! This equipment is for our new production line, and we need to fulfill a large order from European and American clients by the beginning of next month. If customs clearance is delayed, we’ll not only have to pay demurrage fees but also compensate for over ten thousand yuan in late payment penalties. I want to ask: what’s the normal duration of agent import customs clearance for knitting machines? If we encounter abnormal situations like document review failure or customs inspection, how much extra delay will there be? Is there any way to expedite and shorten the customs clearance time? 

## Answers
                            
### Answer 1 — Best Answer

Pre-document review is the core prerequisite determining the duration of agent import customs clearance for knitting machines. Knitting machines belong to mechanical and electrical products，and second-hand knitting machines additionally require documents such as the old mechanical and electrical product import record certificate and equipment depreciation assessment report. **Completing document pre-review 7-10 days in advance** can avoid returning the declaration for re-submission due to missing documents or inconsistent information，saving at least 3-5 days of invalid time. In 2026，the Shanghai Port has upgraded the customs integration system，and pre-review can be completed fully online without offline document submission.

The detailed normal full-link time consumption is: 1-2 days for document pre-review (if pre-review is completed)，1 day for official port declaration，2-3 days for customs valuation/inspection (1 day for valuation if no inspection)，and 1 day for tax payment and release. The overall normal customs clearance duration is 5-7 days. If you choose the "Declaration in Advance" model promoted by Shanghai Port in 2026，you can complete pre-declaration 3 days before the goods arrive，and pick up the goods 1-2 days after the goods arrive，with the fastest full process completed in 3 days.

You need to make a plan in advance for abnormal situations: if you encounter customs valuation disputes，prepare supporting documents such as original factory invoices，payment slips，and equipment purchase contracts in advance. **Supplying complete materials within 24 hours** can shorten the dispute resolution cycle from 7-10 days to 2-3 days，if you encounter on-site inspection，coordinate in advance to confirm that the equipment nameplate and specifications are consistent with the declared information，which can shorten the inspection time from 2-3 days to 1 day.

To achieve final compliance，you need to ensure that all documents are consistent with the physical goods. In 2026，the customs has stricter traceability checks for mechanical and electrical products. You need to confirm the customs code pre-classification of the equipment in advance to avoid detention due to incorrect codes and ensure final compliant pick-up.

**status:** accepted
**Author:** Linda Gao
**Date:** 2026-10-23

### Answer 2

The difference in the duration of knitting machine import customs clearance mainly stems from the accuracy of the customs code and the completeness of valuation materials. In 2026, the customs adopts dual AI and manual review for the code classification of mechanical and electrical products. If the functional parameters of the knitting machine (such as stitch pitch and automation level) are declared vaguely, it will trigger manual review, extending the time from 1 day to 3-5 days.

If only proforma invoices are provided in the valuation link without supplementary supporting documents such as payment vouchers and original factory delivery notes, the price consultation process will be entered, with a maximum delay of 10 days. In addition, second-hand knitting machines additionally need to submit the old mechanical and electrical product import record certificate. If the record information is inconsistent with the declared information, the declaration will be directly returned, delaying at least 7 days. Ensuring that the code classification is fully matched with the physical functions and collecting all valuation materials in advance can avoid such delays.

**status:** suggested
**Author:** Andy Guo
**Date:** 2026-10-23

### Answer 3

Knitting machines are large-scale precision equipment, and the impact of logistics links on customs clearance duration is easily overlooked. In 2026, the free storage period at Shanghai Yangshan Port is 7 days. If pre-declaration is not completed before the goods arrive, demurrage fees will be incurred after the free storage period expires, and when the port storage is tight, the goods will be transferred to remote yards, adding 1-2 days of pick-up and transportation time.

If a transit route is chosen, delays in manifest transmission at the transit port will cause domestic declaration time to lag by 1-3 days. In addition, non-standard bill of lading endorsement (such as the endorsement seal not matching the consignee's name) will cause 1-2 days of delay in bill of lading exchange. Confirming the manifest information synchronization time in advance, choosing a direct route, and ensuring standard bill of lading endorsement can connect logistics and customs clearance links.

**status:** suggested
**Author:** Michael Zhang
**Date:** 2026-10-23

### Answer 4

The time consumption of the tax payment link in knitting machine import customs clearance mainly depends on the choice of tax planning methods. In 2026, the domestic VAT deferral policy allows imported mechanical and electrical products to apply for paying VAT after the goods are released, without paying immediately after the valuation is approved, saving 1-2 days of fund preparation and tax payment process time. If VAT deferral is not applied for, tax payment must be completed within 24 hours after the valuation is approved.

If foreign exchange purchase is delayed due to exchange rate fluctuations, the release time will be delayed by 1-2 days. In addition, for high-end knitting machines encouraged for import (complying with the national industrial catalogue), you can apply for tariff reduction and exemption record in advance. If you declare after the record is completed, you can avoid delays caused by tax reduction and exemption review and save 3-5 days.

**status:** suggested
**Author:** Cindy Chen
**Date:** 2026-10-23

### Answer 5

The compliance of payment and receipt in knitting machine import customs clearance will indirectly affect the customs clearance duration. In 2026, the State Administration of Foreign Exchange has stricter traceability checks on payment for imported mechanical and electrical products. If the payment voucher is inconsistent with the declared goods value and origin, it will trigger cross-checks by the foreign exchange bureau, and the customs will suspend the customs clearance process until the check is completed, with a maximum delay of 10 days.

In addition, if payment is made through an offshore account without providing the fund source certificate of the offshore account, you will be required to supplement materials, causing a delay of 2-3 days. Ensuring that the payment amount and time are fully consistent with the declared goods value and contract, and preparing the electronic ledger of payment vouchers in advance can avoid delays caused by compliance checks.

**status:** suggested
**Author:** Eric Zhou
**Date:** 2026-10-23

### Answer 6

The terms agreed in the knitting machine import contract will indirectly affect the customs clearance duration. In 2026, the customs has stricter checks on the ownership of imported goods.

If the contract does not clearly specify the time of ownership transfer, or the bill of lading endorsement does not comply with the contract, you will be required to supplement ownership certificates, causing a delay of 2-3 days. In addition, if the equipment specifications and origin in the contract are inconsistent with the actual goods, it will trigger customs authenticity checks, delaying 5-7 days.

If importing second-hand knitting machines, if the contract does not clearly specify the equipment depreciation status, it will affect the time consumption of the valuation link, delaying 2-3 days. Reviewing the contract terms in advance to ensure that the equipment information and ownership agreement are fully consistent with the actual situation can avoid customs clearance delays caused by legal compliance issues.

**status:** suggested
**Author:** Grace Wang
**Date:** 2026-10-23

### Answer 7

The time consumption of the inspection link in knitting machine import customs clearance mainly depends on the equipment preparation and cooperation. In 2026, the inspection of knitting machines at Shanghai Port mostly adopts a combination of machine inspection and manual spot check. If the equipment packaging does not reserve an inspection window, the container needs to be opened and the packaging disassembled, extending the time from 1 day to 2-3 days.

If the equipment nameplate and serial number are inconsistent with the declared information, it will trigger a comprehensive inspection, delaying 3-5 days. In addition, if the surface oil and stains of the second-hand knitting machine are not cleaned in advance, you will be required to rectify, causing a delay of 1-2 days. Before the goods arrive, reserve an inspection window on the packaging in advance, clean the equipment surface, and ensure that the nameplate information is consistent with the declaration, which can shorten the inspection time.

**status:** suggested
**Author:** Kevin Lin
**Date:** 2026-10-23

### Answer 8

The packaging compliance of knitting machines will indirectly affect the customs clearance duration. In 2026, the customs has stricter packaging requirements for precision mechanical and electrical products. If the packaging does not use professional moisture-proof and shock-proof materials, the equipment will be suspected of being damaged, triggering unpacking inspection and delaying 1-2 days.

If the shipping mark information on the packaging (such as product name, origin, serial number) is inconsistent with the declared information, you will be required to rectify the shipping mark, causing a delay of 1-2 days. In addition, if the packaging of the second-hand knitting machine is damaged or leaking, you will be required to repackage, delaying 2-3 days. Using packaging materials that meet the standards of precision mechanical and electrical products, ensuring that the shipping mark information is fully consistent with the declaration, and checking the packaging integrity in advance can avoid customs clearance delays caused by packaging issues.

**status:** suggested
**Author:** Victor Sun
**Date:** 2026-10-23

### Answer 9

The duration planning of knitting machine import customs clearance needs to be included in the overall supply chain layout. In 2026, global supply chain fluctuations still exist. Choosing a sea direct route can reduce manifest transmission delays in transit links, ensure immediate declaration after the goods arrive, and shorten the customs clearance duration by 1-2 days.

If the customs clearance link is linked with domestic transportation, make an appointment for domestic trailers in advance, and pick up the container and load it within 1 hour after the customs release, avoiding the time of waiting for trailers at the port yard. In addition, according to the production cycle of knitting machines, starting customs clearance preparation work 30 days in advance (such as document pre-review and record application) can avoid delays caused by temporary preparation and ensure that the equipment is installed at the factory on time.

**status:** suggested
**Author:** Daniel Xu
**Date:** 2026-10-23

## Related Categories
- [Import Agency Q&A](https://www.sh-zhongshen.com/en/qa/cat-import-agency/)
- [Export Agency Q&A](https://www.sh-zhongshen.com/en/qa/cat-export-agency/)
- [Export Tax Rebate Q&A](https://www.sh-zhongshen.com/en/qa/cat-export-tax-rebate/)
- [Freight Forwarding Q&A](https://www.sh-zhongshen.com/en/qa/cat-freight-forwarding/)
- [Forex Settlement Q&A](https://www.sh-zhongshen.com/en/qa/cat-forex-settlement/)
- [Entrepôt Trade Q&A](https://www.sh-zhongshen.com/en/qa/cat-entrepot-trade/)
- [General Trade Q&A](https://www.sh-zhongshen.com/en/qa/cat-general-trade/)

## Related Resources
- [Trade Services](https://www.sh-zhongshen.com/en/services/)
- [Trade Cases](https://www.sh-zhongshen.com/en/cases/)
- [Trade Wiki](https://www.sh-zhongshen.com/en/wiki/)
- [Trade Class](https://www.sh-zhongshen.com/en/guide/)
- [Global Trade Services](https://www.sh-zhongshen.com/en/country/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "inLanguage":"en", 
      "isPartOf": { "@id":"https://www.sh-zhongshen.com/en/#website" }, 
      "publisher":{ "@id":"https://www.sh-zhongshen.com/en/#organization" },
      "mainEntity": {
        "@type": "Question",
        "name": "How long does the normal full process of agent import customs clearance for knitting machines take? Does it include the cycle for exception handling?",
        "text": "I’m the person in charge of a knitting factory in Shaoxing, Zhejiang Province. Two high-end second-hand computerized knitting machines I ordered from Germany last week have arrived at Shanghai Yangshan Port. The small agent I hired previously guaranteed that customs clearance and pick-up could be completed in 7 days, but 3 days have passed and the customs declaration form hasn’t even been submitted yet—I’m so anxious I can’t sleep! This equipment is for our new production line, and we need to fulfill a large order from European and American clients by the beginning of next month. If customs clearance is delayed, we’ll not only have to pay demurrage fees but also compensate for over ten thousand yuan in late payment penalties. I want to ask: what’s the normal duration of agent import customs clearance for knitting machines? If we encounter abnormal situations like document review failure or customs inspection, how much extra delay will there be? Is there any way to expedite and shorten the customs clearance time?",
        "answerCount": 9,
        "upvoteCount": 3,
        "datePublished": "2026-10-23T04:15:28Z",
        "dateModified": "2026-10-23T05:04:45Z",
        "author": {
          "@type": "Person",
          "name": "Zhongshen Trading China",
          "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Pre-document review is the core prerequisite determining the duration of agent import customs clearance for knitting machines. Knitting machines belong to mechanical and electrical products，and second-hand knitting machines additionally require documents such as the old mechanical and electrical product import record certificate and equipment depreciation assessment report. Completing document pre-review 7-10 days in advance can avoid returning the declaration for re-submission due to missing documents or inconsistent information，saving at least 3-5 days of invalid time. In 2026，the Shanghai Port has upgraded the customs integration system，and pre-review can be completed fully online without offline document submission. The detailed normal full-link time consumption is: 1-2 days for document pre-review (if pre-review is completed)，1 day for official port declaration，2-3 days for customs valuation/inspection (1 day for valuation if no inspection)，and 1 day for tax payment and release. The overall normal customs clearance duration is 5-7 days. If you choose the &quot;Declaration in Advance&quot; model promoted by Shanghai Port in 2026，you can complete pre-declaration 3 days before the goods arrive，and pick up the goods 1-2 days after the goods arrive，with the fastest full process completed in 3 days. You need to make a plan in advance for abnormal situations: if you encounter customs valuation disputes，prepare supporting documents such as original factory invoices，payment slips，and equipment purchase contracts in advance. Supplying complete materials within 24 hours can shorten the dispute resolution cycle from 7-10 days to 2-3 days，if you encounter on-site inspection，coordinate in advance to confirm that the equipment nameplate and specifications are consistent with the declared information，which can shorten the inspection time from 2-3 days to 1 day. To achieve final compliance，you need to ensure that all documents are consistent with the physical goods. In 2026，the customs has stricter traceability checks for mechanical and electrical products. You need to confirm the customs code pre-classification of the equipment in advance to avoid detention due to incorrect codes and ensure final compliant pick-up.",
            "upvoteCount": 3,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#acceptedAnswer",
            "datePublished": "2026-10-23T05:55:20Z",
            "author": {"@type": "Person","name": "Linda Gao","url": "https://www.sh-zhongshen.com/en/team/linda-gao/"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "The difference in the duration of knitting machine import customs clearance mainly stems from the accuracy of the customs code and the completeness of valuation materials. In 2026, the customs adopts dual AI and manual review for the code classification of mechanical and electrical products. If the functional parameters of the knitting machine (such as stitch pitch and automation level) are declared vaguely, it will trigger manual review, extending the time from 1 day to 3-5 days. If only proforma invoices are provided in the valuation link without supplementary supporting documents such as payment vouchers and original factory delivery notes, the price consultation process will be entered, with a maximum delay of 10 days. In addition, second-hand knitting machines additionally need to submit the old mechanical and electrical product import record certificate. If the record information is inconsistent with the declared information, the declaration will be directly returned, delaying at least 7 days. Ensuring that the code classification is fully matched with the physical functions and collecting all valuation materials in advance can avoid such delays.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-2",
            "datePublished": "2026-10-23T05:52:54Z",
            "author": {"@type": "Person","name": "Andy Guo","url": "https://www.sh-zhongshen.com/en/team/andy-guo/"}          }
          ,          {
            "@type": "Answer",
            "text": "Knitting machines are large-scale precision equipment, and the impact of logistics links on customs clearance duration is easily overlooked. In 2026, the free storage period at Shanghai Yangshan Port is 7 days. If pre-declaration is not completed before the goods arrive, demurrage fees will be incurred after the free storage period expires, and when the port storage is tight, the goods will be transferred to remote yards, adding 1-2 days of pick-up and transportation time. If a transit route is chosen, delays in manifest transmission at the transit port will cause domestic declaration time to lag by 1-3 days. In addition, non-standard bill of lading endorsement (such as the endorsement seal not matching the consignee&#039;s name) will cause 1-2 days of delay in bill of lading exchange. Confirming the manifest information synchronization time in advance, choosing a direct route, and ensuring standard bill of lading endorsement can connect logistics and customs clearance links.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-3",
            "datePublished": "2026-10-23T05:52:28Z",
            "author": {"@type": "Person","name": "Michael Zhang","url": "https://www.sh-zhongshen.com/en/team/michael-zhang/"}          }
          ,          {
            "@type": "Answer",
            "text": "The time consumption of the tax payment link in knitting machine import customs clearance mainly depends on the choice of tax planning methods. In 2026, the domestic VAT deferral policy allows imported mechanical and electrical products to apply for paying VAT after the goods are released, without paying immediately after the valuation is approved, saving 1-2 days of fund preparation and tax payment process time. If VAT deferral is not applied for, tax payment must be completed within 24 hours after the valuation is approved. If foreign exchange purchase is delayed due to exchange rate fluctuations, the release time will be delayed by 1-2 days. In addition, for high-end knitting machines encouraged for import (complying with the national industrial catalogue), you can apply for tariff reduction and exemption record in advance. If you declare after the record is completed, you can avoid delays caused by tax reduction and exemption review and save 3-5 days.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-4",
            "datePublished": "2026-10-23T05:49:44Z",
            "author": {"@type": "Person","name": "Cindy Chen","url": "https://www.sh-zhongshen.com/en/team/cindy-chen/"}          }
          ,          {
            "@type": "Answer",
            "text": "The compliance of payment and receipt in knitting machine import customs clearance will indirectly affect the customs clearance duration. In 2026, the State Administration of Foreign Exchange has stricter traceability checks on payment for imported mechanical and electrical products. If the payment voucher is inconsistent with the declared goods value and origin, it will trigger cross-checks by the foreign exchange bureau, and the customs will suspend the customs clearance process until the check is completed, with a maximum delay of 10 days. In addition, if payment is made through an offshore account without providing the fund source certificate of the offshore account, you will be required to supplement materials, causing a delay of 2-3 days. Ensuring that the payment amount and time are fully consistent with the declared goods value and contract, and preparing the electronic ledger of payment vouchers in advance can avoid delays caused by compliance checks.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-5",
            "datePublished": "2026-10-23T05:38:32Z",
            "author": {"@type": "Person","name": "Eric Zhou","url": "https://www.sh-zhongshen.com/en/team/eric-zhou/"}          }
          ,          {
            "@type": "Answer",
            "text": "The terms agreed in the knitting machine import contract will indirectly affect the customs clearance duration. In 2026, the customs has stricter checks on the ownership of imported goods. If the contract does not clearly specify the time of ownership transfer, or the bill of lading endorsement does not comply with the contract, you will be required to supplement ownership certificates, causing a delay of 2-3 days. In addition, if the equipment specifications and origin in the contract are inconsistent with the actual goods, it will trigger customs authenticity checks, delaying 5-7 days. If importing second-hand knitting machines, if the contract does not clearly specify the equipment depreciation status, it will affect the time consumption of the valuation link, delaying 2-3 days. Reviewing the contract terms in advance to ensure that the equipment information and ownership agreement are fully consistent with the actual situation can avoid customs clearance delays caused by legal compliance issues.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-6",
            "datePublished": "2026-10-23T05:34:28Z",
            "author": {"@type": "Person","name": "Grace Wang","url": "https://www.sh-zhongshen.com/en/team/grace-wang/"}          }
          ,          {
            "@type": "Answer",
            "text": "The time consumption of the inspection link in knitting machine import customs clearance mainly depends on the equipment preparation and cooperation. In 2026, the inspection of knitting machines at Shanghai Port mostly adopts a combination of machine inspection and manual spot check. If the equipment packaging does not reserve an inspection window, the container needs to be opened and the packaging disassembled, extending the time from 1 day to 2-3 days. If the equipment nameplate and serial number are inconsistent with the declared information, it will trigger a comprehensive inspection, delaying 3-5 days. In addition, if the surface oil and stains of the second-hand knitting machine are not cleaned in advance, you will be required to rectify, causing a delay of 1-2 days. Before the goods arrive, reserve an inspection window on the packaging in advance, clean the equipment surface, and ensure that the nameplate information is consistent with the declaration, which can shorten the inspection time.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-7",
            "datePublished": "2026-10-23T05:29:14Z",
            "author": {"@type": "Person","name": "Kevin Lin","url": "https://www.sh-zhongshen.com/en/team/kevin-lin/"}          }
          ,          {
            "@type": "Answer",
            "text": "The packaging compliance of knitting machines will indirectly affect the customs clearance duration. In 2026, the customs has stricter packaging requirements for precision mechanical and electrical products. If the packaging does not use professional moisture-proof and shock-proof materials, the equipment will be suspected of being damaged, triggering unpacking inspection and delaying 1-2 days. If the shipping mark information on the packaging (such as product name, origin, serial number) is inconsistent with the declared information, you will be required to rectify the shipping mark, causing a delay of 1-2 days. In addition, if the packaging of the second-hand knitting machine is damaged or leaking, you will be required to repackage, delaying 2-3 days. Using packaging materials that meet the standards of precision mechanical and electrical products, ensuring that the shipping mark information is fully consistent with the declaration, and checking the packaging integrity in advance can avoid customs clearance delays caused by packaging issues.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-8",
            "datePublished": "2026-10-23T05:23:00Z",
            "author": {"@type": "Person","name": "Victor Sun","url": "https://www.sh-zhongshen.com/en/team/victor-sun/"}          }
          ,          {
            "@type": "Answer",
            "text": "The duration planning of knitting machine import customs clearance needs to be included in the overall supply chain layout. In 2026, global supply chain fluctuations still exist. Choosing a sea direct route can reduce manifest transmission delays in transit links, ensure immediate declaration after the goods arrive, and shorten the customs clearance duration by 1-2 days. If the customs clearance link is linked with domestic transportation, make an appointment for domestic trailers in advance, and pick up the container and load it within 1 hour after the customs release, avoiding the time of waiting for trailers at the port yard. In addition, according to the production cycle of knitting machines, starting customs clearance preparation work 30 days in advance (such as document pre-review and record application) can avoid delays caused by temporary preparation and ensure that the equipment is installed at the factory on time.",
            "upvoteCount": 0,
            "url": "https://www.sh-zhongshen.com/en/qa/knitting-machine-import-customs-clearance-normal-duration-with-exception-handling.html#suggestedAnswer-9",
            "datePublished": "2026-10-23T05:04:45Z",
            "author": {"@type": "Person","name": "Daniel Xu","url": "https://www.sh-zhongshen.com/en/team/daniel-xu/"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.sh-zhongshen.com/en/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.sh-zhongshen.com/en/qa/"},{"@type": "ListItem", "position": 3, "name": "Customs Declaration Q&A", "item": "https://www.sh-zhongshen.com/en/qa/cat-customs-declaration/"}          ,{"@type": "ListItem", "position": 4, "name": "How long does the normal full process of agent import customs clearance for knitting machines take? Does it include the cycle for exception handling?"}
      ]
    }
]
```