Import Japanese Injection Molding Machines: A Full Guide
or complex compliance issues.
clearance and fund security.
Do you want to import Japanese injection molding machines but are overwhelmed by the cumbersome import procedures?Old mechanical and electrical equipment filing,license application,technical document preparation.Every step is full of challenges.Dont worry.Professional foreign trade agents for importing Japanese injection molding machines provide you with one - stop solutions,clearing all obstacles,enabling you to easily introduce advanced Japanese technology and improve production efficiency!The service content and process of foreign trade agency for importing Japanese injection molding machines are as follows:

IV.Handling of Special Circumstances
I.Core agency service content
- Handlingofaccessqualifications
- Handletheimportlicenseformechanicalandelectricalproducts(forinjectionmoldingmachineswithregulatorycode8462)
- Handle
- Applyforexemptionfromcertification(meetingtheconditionsoftheImplementationRulesforExemptionfromCompulsoryProductCertification)Applicationforexemption(meetingtheconditionsofthe"ImplementationRulesforExemptionfromCompulsoryProductCertification")
- Includes risk assessment reports,performance test data,clinical evaluation reports,etc.
- CompileChineseoperationinstructions(inlinewiththeGB5226.1MechanicalandElectricalSafetyStandard)
- HandlethecompliancestatementofconvertingJapaneseJISstandardstoChineseGBstandards
- FinancialSolutions
- Open a 90 - day usance
- (Thecreditlinecanreachupto85%ofthecargovalue)Operatecross-borderfinancialleasing(theminimumdown-paymentratiois20%)
- Handleimportbillofexchange(exchangeratelockingservice)
- InspectionandSupervisionServices
- Arrange inspection in Hong Kong by China Inspection Company (pre - inspection items include hydraulic system leakage detection)
- HandletheCertificateofExemptionfromPre-inspectionbeforeShipmentofImportedUsedMechanicalandElectricalProducts(newmachinesareexemptfrominspection)
- Coordinatewiththelocalcustomsforinspection(focusoncheckingsafetyprotectiondevices)
- TimeLimitRequirements
II.Standard operation process
| Stage | Key operations | Determine the agency method (self - operation/entrustment) |
|---|---|---|
| Signing of the agency agreement | Agree on the exchange rate risk sharing ratio 3 working days | Handling of Pre - approval |
| File with the provincial commodity inspection bureau | Apply for an automatic import license (O license) 15 - 20 working days | Pre - shipment Preparation |
| Pre - inspection at the Japanese factory (the Japanese - based institution of China Inspection Company) | Handle the cleanliness of the equipment (remove residual plastic) 7 - 10 working days | Choose roll - on/roll - off ship transportation (special for precision equipment) |
| Conduct pre - shipment inspection (China Certification & Inspection Group) | Insure All risks + war risksOsaka → Shanghai Port: 5 - 7 days | Customs Declaration |
| Customs declaration | Submit a copy of the Japanese business registration 1 working day (electronic document review) | Local Inspection |
| Energy efficiency test (compare the differences between Japanese JEA and national standards) | Check safety protection devices 3 - 5 working days | Equipment Acceptance |
| No - load trial operation (continuous test for ≥ 72 hours) | Issue the Imported Equipment Acceptance Report 7 working days | Technical Risk Control |
III.Risk management key points
- UsedequipmentneedstoprovidetheMaintenanceRecordfromtheJapaneseoriginalfactory:
- 5.ImpactonDomesticandForeignMarkets:
- ThenewequipmentshallmeettheChineseenergyefficiencygradeIIstandard(refertoGB30253-2013)
- Legal compliance:
- HandleROHSdirectivecompliancedocuments(includingthedetectionofsixhazardoussubstances)
- Handletheimportrecordationwiththeenvironmentalprotectiondepartment(involvingtheinjectionmoldingwastegastreatmentdevice)
- Financial guarantee:
- Thepaymentmethodadopts"10%deposit+80%letterofcredit+10%retentionmoney".
Apply for the Record of Pre - inspection before Shipment of Imported Used Mechanical and Electrical Products (the service life of the injection molding machine ≤ 8 years)
| Situation | Solution |
|---|---|
| Customs price review and suspicion | Provide to the Japanese CustomsDocument + notarized original factory invoice |
| Replacement of core components | Declare the Application Form for Replacement of Imported Parts of Mechanical and Electrical Products in advance |
| Package damage | Launch and record the Technical Rectification Plan, |
Note: When it comes to the supporting import of molds,special attention should be paid to the accuracy of classification (molds and the main machine need to be declared separately).For intelligent manufacturing injection molding machines (including automated modules such as manipulators),separate confirmation procedures for the Catalogue of Encouraged Imported Technologies need to be handled.
The import of Japanese injection molding machines is not only the introduction of equipment,but also the precise grasp of international trade rules.With the escort of professional agents,from qualification handling to equipment acceptance,from technical preparation to financial support,you can be in full control and win from afar.Contact us now and let your enterprise catch the express train of technological upgrading!