What Core Nodes and Compliance Control Details Should Be Noted in the Whole Process of Imported Crude Oil Agency?

Resolved
SERVICE
TRACKING NO. 20260706 / GLOBAL Zhongshen Trade · 23+ Years of Expert Trade Agency
Trade Challenges?
No import/export license, customs delays,
or complex compliance issues.
Our Solution
One-stop full-chain agency: ensure efficient
clearance and fund security.
Cost OptimizationUrgent ClearanceGlobal ResourcesCompliant Rebates

I am the purchasing head of a private petrochemical trading company based in Shanghai, China. Last month, I attempted to import 50,000 tons of Middle Eastern crude oil for the first time and hired a small agency company. Unfortunately, they neglected to check the validity period of the Automatic Import License, which led to failure of normal customs declaration after the cargo arrived at port.

The cargo was detained at the port for 10 days, generating nearly 300,000 yuan in container detention fees and storage fees, and was almost seized by customs. Our company leaders were extremely upset and ordered me to finalize the complete process plan for the next batch of crude oil import agency within this month.

I want to learn in detail how imported crude oil agency should be properly operated, including core details of preliminary document review, connection control of core operation nodes, emergency response plans for abnormal situations, and compliant cost optimization paths. I really fear making mistakes again that will cause huge losses.

Expert Insights

Expert Q&A

Linda Gao
Linda GaoYears of service:7Customer Rating:5.0

Documentation SupervisorStart a Chat

First of all,for pre-document review details,we need to focus on checking the validity period of Automatic Import License,and the consistency between the declared customs port and the actual arrival port. Meanwhile,we need to confirm the authenticity and data matching of crude oil's certificate of origin,quality certificate and weight certificate. In particular,indicators such as crude oil grade,density and sulfur content on the certificates must be fully consistent with the information on the customs declaration and bill of lading,to avoid triggering customs price verification or surveillance inspection due to document inconsistency. In addition,we need to verify in advance whether the electronic data of the entry goods clearance permit has been synchronized to the customs system,eliminating customs declaration obstruction caused by untransmitted data.

In terms of connection of core nodes,customs pre-declaration shall be completed 72 hours before cargo arrival at port,and we shall coordinate with the logistics team simultaneously to confirm special storage space at the terminal,ensuring that container pickup and transfer can be arranged immediately after customs clearance and release. For taxation,VAT deferment filing shall be completed in advance to avoid occupying enterprise working capital due to full advance payment of value-added tax.

Contingency plans for abnormal situations shall cover three core scenarios: if document errors are found,contact the issuing authority or overseas supplier to modify or reissue the document within 24 hours before arrival,and update pre-declaration data synchronously,if customs surveillance inspection is required,prepare the sample test report from a third-party testing institution in advance,and cooperate with on-site inspection to complete verification,if there is a risk of port detention,apply to the terminal for extending the free storage period immediately,and coordinate the agency to submit an urgent review application to the customs.

In the final compliance implementation stage,foreign exchange compliance filing for import payment shall be completed within 10 days after cargo release,and the full set of documents (including customs declaration,document copies,and payment vouchers) shall be retained for no less than 5 years,to meet the post-inspection requirements of the Customs and the State Administration of Foreign Exchange.

Reference: Air Freight Compliance & Costs: Your 2025 Guide
Kevin Lin
Kevin LinYears of service:4Customer Rating:5.0

Trade Solutions ManagerStart a Chat

In the customs declaration link of imported crude oil, attention shall be paid to the compliance of price verification logic. The Customs will conduct price verification with reference to the import transaction price of the same grade crude oil in the same period and international crude oil futures price. If the agency fails to prepare supporting materials proving the rationality of the transaction price (such as trade contract, inquiry letter, detailed cost breakdown) in advance, it is very easy to trigger price verification disputes and lead to customs clearance delay.

In addition, secondary declaration shall be completed in strict accordance with the requirements of the General Administration of Customs of China: first declare for customs clearance, then supplement the electronic data of the certificate of origin within the specified time limit, to avoid deletion and re-declaration caused by incorrect declaration process. In case of pending entry issue, the application for pending entry and relevant supporting materials shall be submitted within 3 working days after the entry is put on hold, otherwise the subsequent import qualification will be affected.

Eric Zhou
Eric ZhouYears of service:6Customer Rating:5.0

Senior Manager of Foreign Exchange & Tax RebatesStart a Chat

For the logistics route of imported crude oil, priority shall be given to direct voyage to a special terminal with crude oil handling qualification, to avoid title risk and port detention delay caused by transshipment. The vessel's berthing plan shall be confirmed in advance, and the length of free storage period shall be confirmed with the terminal simultaneously. Generally, the free storage period for crude oil is 7-10 days. If extension is needed, the application shall be submitted 3 days before arrival, otherwise high port detention fees will be incurred.

For endorsement transfer of bill of lading, the continuity of endorsement shall be ensured. If it is a straight bill of lading, the accuracy of consignee information shall be confirmed with the overseas supplier in advance, to avoid failure to pick up goods due to inconsistent bill of lading information. In addition, the vessel's dynamics shall be tracked in real time, and manifest information shall be confirmed to have been transmitted to the customs system 24 hours before vessel arrival, to avoid customs declaration obstruction caused by manifest problems.

Evelyn Li
Evelyn LiYears of service:3Customer Rating:5.0

Cross-border Compliance SupervisorStart a Chat

Tax optimization for imported crude oil can be realized through VAT deferment filing. Enterprises do not need to pay the full amount of value-added tax in advance at the time of customs declaration, but complete tax declaration within the specified time limit, which can effectively reduce working capital occupation. In addition, attention shall be paid to the withholding obligation of withholding tax for non-resident enterprises.

If the overseas supplier has no permanent establishment in China, the enterprise shall withhold the prepaid income tax in accordance with regulations, to avoid tax risk caused by failure to fulfill the withholding obligation. At the same time, the pricing of cross-border related party transactions shall be reasonably planned to ensure that the transaction price complies with the arm's length principle, and avoid tax supplement and late payment penalty caused by transfer pricing adjustment.

Daniel Xu
Daniel XuYears of service:10Customer Rating:5.0

Director of Import & Export OperationsStart a Chat

Payment and settlement for imported crude oil shall be implemented in strict accordance with the requirements of the State Administration of Foreign Exchange (SAFE). If RMB cross-border payment via CIPS is adopted, it shall be ensured that the transaction code in the message matches the corresponding code for crude oil import, to avoid obstruction of foreign exchange settlement and account reconciliation caused by code error.

For offshore account management, attention shall be paid to the compliance of capital flow. Payment funds for imported crude oil shall not be used for other unrelated transactions, otherwise the enterprise will be listed as a key supervision target by SAFE. In addition, import payment verification and filing shall be completed within 30 days after payment, and materials such as payment voucher, trade contract and customs declaration shall be retained for post-inspection by SAFE.

Victor Sun
Victor SunYears of service:5Customer Rating:5.0

Trade Risk Control ManagerStart a Chat

The trade contract for imported crude oil shall clearly define the coverage of the force majeure clause, especially cover factors that may affect delivery such as vessel delay, port strike, international sanctions, etc., to avoid breach of contract disputes caused by force majeure. Soft clauses in the letter of credit shall be avoided, such as "payment shall be effected after the buyer confirms sample quality", to prevent overseas suppliers from refusing delivery or delaying payment on this ground.

For title transfer, the authenticity of the bill of lading and legality of endorsement shall be ensured. If surrendered bill of lading is adopted, the authenticity of the surrender authorization shall be confirmed with the overseas supplier in advance, to avoid title disputes.

Andy Guo
Andy GuoYears of service:3Customer Rating:5.0

Supply Chain Management ExpertStart a Chat

For on-site inspection of imported crude oil, focus shall be placed on authenticity verification of seals. The number of the vessel's hatch seal shall be checked to match the number on the bill of lading and manifest. If seal damage or number mismatch is found, an application for unpacking inspection shall be submitted to the customs immediately.

During devanning inspection, cooperate with the customs for sampling and testing. Samples shall be taken from different cabins according to the specified proportion to ensure sample representativeness. If the indicators in the test report do not match those in the customs declaration, an application for retesting shall be submitted within 3 working days, and the quality certificate from the overseas supplier shall be provided as support, to avoid customs detention caused by indicator mismatch.

Lucas Liu
Lucas LiuYears of service:8Customer Rating:5.0

Senior Operations ConsultantStart a Chat

Supply chain planning for imported crude oil shall combine the enterprise's inventory demand and price fluctuations of the international crude oil market, and adopt an inventory linkage strategy: increase import volume when prices are low, and reduce import volume when prices are high, to reduce procurement costs. Selection of trade terms shall be based on logistics route and title control requirements.

If the enterprise has strong logistics management and control capability, FOB term can be selected to control the transportation and insurance links of the goods; if it is necessary to reduce logistics risk, CIF term can be selected, with the overseas supplier responsible for transportation and insurance. In addition, a cost actuarial model shall be established to comprehensively consider various costs such as customs declaration fee, logistics fee and tax, to optimize the cost structure of import agency.

Note: We respect all users' expressions; however, user comments represent their personal views only.