Connect & Solve
Trade Q&A
What are the whole-process compliance operation specifications for international freight forwarders carrying out export trade?
or complex compliance issues.
clearance and fund security.
I am the foreign trade person in charge of a small manufacturing enterprise in Shanghai. I just signed an order for 12 sets of precision machinery to Europe last week, and it is my first time to hire a third-party international freight forwarder for export, so I am really uncertain. Previously, the freight forwarder of my peer friend had inconsistent commodity name on the bill of lading and the customs declaration, which caused the goods to be detained at the Port of Hamburg for 10 days.
The container detention charge and late fee alone cost nearly 80,000 RMB, and it almost affected the customer's contract renewal in the end. Now I am not only worried about the operation compliance of the freight forwarder, but also afraid of delivery delay caused by poor process connection, and I don't know how to supervise the key nodes. I want to ask how your international freight forwarder can help me complete this export trade safely?

Cindy ChenYears of service:3Customer Rating:5.0
Key Account ManagerStart a Chat
First of all,for pre-document review details,the full set of documents need to be sorted out 3-5 working days in advance: the commodity name,HS Code,and commodity value on the commercial invoice,packing list and customs declaration must be completely consistent. Focus on checking the regulatory conditions of HS Code,for example,confirm whether a customs clearance certificate for commodity inspection is required for precision machinery,so as to avoid triggering pre-audit alarm due to inconsistent documents.
The connection of core nodes needs to achieve "three synchronizations": pre-entered information from the customs broker is synchronized with the freight forwarder's manifest information,port container picking is synchronized with the customs release instruction,and overseas agent's pre-declaration is synchronized with the push of domestic loading information,ensuring that the error of each node is controlled within 24 hours.
Contingency plans for abnormalities need to be formulated in advance: in case of customs control inspection,arrange on-site specialists to coordinate immediately,and provide the original quality inspection report and technical specification of the machinery as supporting documents,in case of container rolling by the shipping company,coordinate for an extra vessel on the same route or reallocate space from other shipping companies immediately,and update the delivery date to the customer synchronously.
In the final compliance implementation stage,the customs declaration needs to be closed within 3 working days after loading,and the full set of documents shall be sorted out and archived at the same time to meet the "four flows consistency" requirement for export tax refund,so as to avoid affecting the subsequent tax refund process.
Eric ZhouYears of service:6Customer Rating:5.0
Senior Manager of Foreign Exchange & Tax RebatesStart a Chat
In the customs declaration link, we need to focus on the consistency of valuation logic. The commodity value on the commercial invoice must match the value on the customs declaration and the factory's value-added tax invoice, so as to avoid triggering customs valuation questioning due to "price deviation alarm". In case of customs valuation, supporting materials such as purchase contracts, payment slips and original factory pricing letters shall be provided.
It is forbidden to evade tariffs by underreporting commodity value, otherwise it will trigger administrative penalty for "price misreporting" and affect the enterprise's customs credit rating. In addition, using the integrated customs clearance mode for declaration can reduce the review cycle of customs declaration from 24 hours to 8 hours, reducing the risk of port detention.
Victor SunYears of service:5Customer Rating:5.0
Trade Risk Control ManagerStart a Chat
For the export logistics of precision machinery, direct route should be preferred rather than transshipment route. The risk of title transfer of transshipment route is more than 3 times that of direct route, and it is easy to cause damage to the precision of machinery due to storage at the transit port. It is necessary to confirm the free storage period of the shipping company in advance.
The standard free storage period of Shanghai Port is 7 days. If extension is required, apply to the shipping company 3 working days in advance to avoid container detention charges. The bill of lading shall be "order bill of lading", and "to order" shall be indicated when endorsing, ensuring that the title of goods is transferred only after full payment is received, so as to avoid the risk of delivery without bill of lading.
Michael ZhangYears of service:6Customer Rating:5.0
Customs Declaration & Compliance ExpertStart a Chat
Precision machinery exported to Europe can apply for the EU VAT deferral policy, which does not require paying import VAT in the importing country, can reduce the capital occupation cycle from 3 months to 0, and directly reduce the capital cost by about 13% (calculated based on the EU average VAT rate of 19%).
Two conditions are required to apply for VAT deferral: first, the enterprise has completed VAT number registration in the importing country, second, the freight forwarder needs to provide the "Deferral Declaration Power of Attorney" and push the customs declaration information to the national tax bureau of the importing country synchronously. It should be noted that VAT deferral is not tax exemption, and it needs to be deducted in the subsequent VAT declaration cycle to avoid triggering tax inspection.
Evelyn LiYears of service:3Customer Rating:5.0
Cross-border Compliance SupervisorStart a Chat
For the payment and collection link, CIPS (Cross-Border Interbank Payment System) shall be used for RMB cross-border payment. Compared with SWIFT, it can reduce exchange rate fluctuation risk by about 20%, and shorten the arrival time from 3-5 working days to 1-2 working days. It is necessary to ensure that the transaction remark on the receipt slip is consistent with the "trade mode" on the customs declaration.
For example, if the trade mode is "general trade", the remark shall indicate "general trade payment", so as to avoid triggering capital inspection by the State Administration of Foreign Exchange due to vague transaction remark. In addition, if the advance payment mode is adopted, the goods shall be declared and exported within 30 days after receiving the payment, so as to avoid exceeding the foreign exchange supervision period.
Lucas LiuYears of service:8Customer Rating:5.0
Senior Operations ConsultantStart a Chat
If the customer adopts letter of credit settlement, focus on checking soft clauses, such as the clause that "negotiation can only be conducted after the customer confirms the sample", which directly transfers the negotiation initiative to the customer and easily leads to collection risk.
It is necessary to add a "force majeure fallback clause" in the letter of credit, clearly stipulating that no liability for breach of contract shall be borne for delivery delay caused by force majeure factors such as port congestion and shipping company delay. In addition, it is necessary to complete "Intellectual Property Customs Protection Filing" to avoid patent infringement of precision machinery in the export process.
Andy GuoYears of service:3Customer Rating:5.0
Supply Chain Management ExpertStart a Chat
In case of on-site customs inspection, prepare the seal number of the machinery in advance and check it with the seal information on the packing list to ensure the seal is intact and undamaged. When unpacking for inspection, arrange a special person to accompany the whole process to avoid damage to the precision parts of the machinery caused by improper operation of inspectors.
If the machine inspection image shows abnormality, provide the 3D exploded view and technical parameter table of the machinery immediately to explain the internal structure of the machinery, so as to avoid being misjudged as contraband. After the inspection is completed, ask for the "Inspection Result Notice" as the voucher for subsequent abnormal appeal.
Linda GaoYears of service:7Customer Rating:5.0
Documentation SupervisorStart a Chat
The export packaging of precision machinery shall adopt the UN buffer packaging scheme: high-strength corrugated carton for the outer layer, 5cm thick EPE pearl cotton buffer layer for the middle layer, and customized foam mold for the inner layer to fix the precision parts of the machinery, ensuring no damage after 1.5-meter drop test.
The MSDS report in line with EU standards shall be prepared, which clearly states the material, weight and protection requirements of the machinery, so as to avoid being rejected by the port due to non-compliant packaging. In addition, Chinese and English marks such as "Fragile", "Precision Instrument", "This Side Up" shall be marked outside the packaging to ensure operation compliance during loading and unloading.
Daniel XuYears of service:10Customer Rating:5.0
Director of Import & Export OperationsStart a Chat
In the export tax refund link, it is necessary to ensure the "four flows consistency", that is, the information of contract flow, capital flow, invoice flow and goods flow are completely consistent. Pre-declaration of export tax refund shall be completed within 10 working days after the customs declaration is closed. If the "incomplete information" alarm occurs in the pre-declaration, contact the freight forwarder immediately to obtain the manifest information and update it to the tax system synchronously.
It is necessary to avoid the risk of capital backflow, and it is forbidden to collect foreign exchange through third-party personal accounts, otherwise it will trigger tax correspondence investigation and prolong the tax refund cycle to 3-6 months. In addition, the full set of documents (customs declaration, commercial invoice, packing list, receipt slip) shall be archived and retained for more than 5 years for tax inspection.